4-Acre Land Clearing — Development Site

King City, ON 4 acres Developer
Heavy machinery clearing a multi-acre forested development site

Project Overview

A developer preparing a 4-acre parcel for a residential subdivision needed the site fully cleared ahead of grading and servicing, on a schedule tied to their civil engineer's construction timeline.

The Challenge

The parcel was densely wooded with mixed hardwood and softwood stands, and the approved site plan required a buffer strip of trees preserved along the property's north edge. Clearing had to be sequenced so the grading contractor could mobilize the moment clearing finished.

What We Did

Excavators

Forestry mulcher

Bulldozer

Dump trucks

Safety Measures

The site was fenced and signed for the duration of the clearing phase, with a designated equipment staging area kept clear of the active work zone. Buffer-strip trees were flagged and fenced before any clearing equipment mobilized, to prevent accidental encroachment.

Before & After

Results

The site was fully cleared and grubbed within the developer's schedule, with the required buffer strip intact and verified against the site plan. The grading contractor was able to mobilize the next business day.